General Permit TXR040000 for Phase II (Small) MS4s

Requirements for obtaining authorization for stormwater discharges from small MS4s, the new General Permit, forms and annual reporting.

HOTUPDATERenewal of the Phase II MS4 General Permit, TXR040000

On August 14, 2024, the Commission adopted the 2024 TPDES Phase II (Small) Municipal Separate Storm Sewer System (MS4) General Permit, TXR040000. The renewed general permit was issued and effective on August 15, 2024.

Existing small MS4 permittees and newly regulated small MS4s (due to the new or expanded urban areas with a population of at least 50,000 people in the 2020 Decennial Census) have 180 days from the effective date of the 2024 general permit to submit a Notice of Intent (NOI) or a Waiver application, as appropriate. Applications must be submitted by February 11, 2025.

Small MS4s must first develop or update their Stormwater Management Program (SWMP) to address the 2024 general permit requirements prior to submitting the complete NOI and $400 application fee to obtain authorization to discharge.

The NOI or Waiver must be submitted electronically via the NPDES Electronic Reporting Tool for MS4s (NeT-MS4 ) online electronic permitting system, unless the MS4 operator requested and obtained an Electronic Reporting Waiver.

Small MS4 operators that are granted an Electronic Reporting Waiver must submit the application on a paper NOI or Waiver form provided by the executive director. Contact the TCEQ Stormwater Team to obtain the Request for Electronic Reporting Waiver Form (TCEQ-20754). This form must be submitted along with submittal of a paper application (NOI or Waiver) for authorization under the 2024 general permit.

NOTE: Existing small MS4 operators must continue to implement ongoing items in their most recently TCEQ approved SWMP until a renewal NOI is submitted and approved under the 2024 general permit.

Back to the top of the page Back to top

2024 TPDES General Permit for Phase II MS4s

The 2024 Phase II MS4 General Permit, TPDES Permit No. TXR040000, was issued on August 15, 2024. It authorizes the discharge of stormwater to surface water in the state from small MS4s.

For specific information on the permit requirements, please refer to the following:

To access historical information for the renewal process, please go to the Stormwater Stakeholders Group (SWSG) webpage.

Back to the top of the page Back to top

Net-MS4 Training:

U.S. EPA is offering a free webinar to introduce and showcase the new NeT-MS4 application and reporting tool developed for the small MS4s in Texas. Attendees will learn how to setup a Central Data Exchange (CDX) account, access the Texas NeT-MS4 system, and apply for an MS4 Waiver and NOI.

Webinar Date: September 17, 2024, from 9:00 a.m. to 11:30 a.m. CDT

This training is specific to the NeT-MS4 platform and will not go over the TXR040000 permit requirements or general permit compliance.

This training will be live, recorded, and made available for future reference. Please register for the webinar at EPA’s website: https://usepa.servicenowservices.com/oeca_icis/en/ms4-training-schedule?id=kb_article_view&sys_kb_id=44554c2c1bf3069079ab0f67624bcb36&spa=1

For additional information see the Assistance Tools for Stormwater Permitting.

Back to the top of the page Back to top

2019 TPDES General Permit TXR040000

Back to the top of the page Back to top

2013 TPDES General Permit TXR040000

Back to the top of the page Back to top

2007 TPDES General Permit TXR040000

Back to the top of the page Back to top

Contact us if you have any questions about this general permit.